top of page
Modern Building Exterior

REFERENCES 

Schloss HKLS

01

Project: Modernization of the Ventilation Systems at Arendsee Castle
Location: 17291, Nordwestuckermark
Timeframe: Summer 2024
Area: Ventilation of the Sports Hall, SPA, and Castle

 

Services:
As part of this project, ventilation systems for the sports hall and SPA area were installed with special consideration for the historical building structure. After installation, the systems were commissioned and precisely fine-tuned to ensure smooth operation and effectively reduce energy losses.

02

Project: Optimization of Ventilation and Air Conditioning Systems to Improve Comfort and Energy Efficiency
Location: 10405, Berlin
Timeframe: Fall 2023
Area: Ventilation and Cooling

 

Services:
As part of the project, pressure losses in the ventilation ducts were calculated, and detailed floor plans and schematics for the ventilation and cooling systems were created. Existing systems were optimized, and new ventilation units were planned to reduce energy consumption and enhance comfort. The implementation took place in several phases, including the approval of design and execution plans.

1-min.jpg
78c6a9_912fc860c58b4913a286f5c81246d5a5~mv2.png

03

​Project: New Construction of an Office and Residential Building
Location: 10785, Berlin
Timeframe: Winter 2023/24
Area: Heating and Cooling Technology

​

Services:
As part of our support for the client in selecting convectors from our partner MINIB, we took atypical, custom dimensions into account. These convectors offer increased performance and reduced noise levels, contributing to a pleasant indoor climate.

04

Project: Energy Renovation of 54 Apartments, Including Attic Conversion
Location: 10245, Berlin
Timeframe: Summer/Fall 2024
Area: Ventilation Technology

 

Services:
As part of the energy renovation of 54 apartments, including the conversion of the attic, modern ventilation systems were installed to enhance air quality and living comfort. By using demand-controlled ventilation and heat recovery systems, energy efficiency was significantly improved, reducing overall energy consumption. The new systems were seamlessly integrated into the existing building structure to ensure a smooth and efficient upgrade.

Untitled design-10.jpg

Kontaktieren Sie uns

Unser Team steht Ihnen jederzeit zur Verfügung, um Ihnen bei allen Fragen zu unseren Leistungen zu helfen. Sie können uns gerne eine Nachricht über unser Kontaktformular schicken. Wir freuen uns darauf, von Ihnen zu hören.

Alte Werftstraße 8, 15712, Königs Wusterhausen

+49 3375 2823989

bottom of page