01

Project: Installation of HVAC systems in an office building, including server rooms

Location: Kyiv, Ukraine

Execution Period: 2020-2021

Scope: Heating, Ventilation, Air Conditioning, Technical Equipment

Services:

  • Optimization of project documentation: Actively working on improving and optimizing project documentation to ensure compliance with requirements and maximize work efficiency.

  • Management of subcontractors: Responsibly leading the search process and collaborating with subcontractors, selecting only those who guaranteed a high standard of performance and work quality.

  • Performance monitoring: Personally ensuring that all performance phases met the high standards and requirements of the project.

02

Project: Heating of workshops

Location: Dnipro, Ukraine

Execution Period: 2020-2021

Scope: Heating, Technical Equipment

​

Services:

The replacement of the heating source in the workshops from a central to a local heating source using dark infrared heaters resulted in a saving of approximately 90% of the natural gas used for heating these workshops.

  • Replacement of gas heaters in residential areas with electric devices, including electric water heaters.

  • Installation of necessary equipment in the administrative building and its conversion to local gas heating, which was more sensible in terms of energy resource saving according to calculations.

hvac
Industrial

03

Project: Equipment of the compressor station at the plant

Location: Kryvyi Rih, Ukraine

Execution Period: 2021

Scope: Heating, Technical Equipment

Services:

Due to significant energy losses in the transmission lines and inefficient performance of outdated turbine compressor stations, the repair and machine plant in Kryvyi Rih decided to develop and implement a new compressor station project. The realized project included:

  • Deployment of two 400-volt compressors with frequency control, each with a capacity of 415 kW,

  • Two high-voltage compressors (6000 volts) with capacities of 315 kW and 280 kW.

This solution aims to significantly improve the efficiency and energy transmission of the system.

04

Project: Replacement of coke oven gas with blast furnace gas in an industrial center

Location: Zaporizhzhia, Ukraine

Execution Period: 2021

Scope: Gas supply, Technical Equipment

Services:

  • Development of concept and planning of measures for efficient utilization of blast furnace gases and environmental protection.

  • Includes technical improvements, new heat pipelines, burner retrofitting, and restoration of heat-resistant coating of the boiler.

  • Initiative in concept development, conducting energy efficiency calculations, and successful coordination of all project phases.

  • Goals: Efficient resource utilization, reduction of CO2 emissions, contribution to environmental protection.

hvac
pharmacy

05

Project: Implementation of modern climate control and heat recovery

Location: Kyiv & Kyiv Region, Ukraine

Execution Period: 2018-2021

Scope: Heating, Ventilation, Air Conditioning, Technical Equipment

Services:

  • Equipment installation to maintain optimal microclimate in the warehouse complex 

  • Equipment installation to maintain microclimate in the warehouse for medical preparations.

  • Installation of ventilation and air conditioning system in the changing room of the workshop for the production of medical preparations.

  • Installation of a compressor unit with heat recovery from the warehouse heating.

06

Project: Office Building, Berlin

Location: Berlin, Germany

Execution Period: 2023

Scope: Heating, Ventilation, Air Conditioning, Plumbing, Technical Equipment

Services:

  • Management of planning and installation works for extensive renovation project at the headquarters

  • Redesign of premises for hotel and office use

  • Installation of heating, plumbing, and air conditioning systems across multiple floors

  • Implementation of modern, energy-efficient technologies to enhance overall building efficiency

  • Coordination of collaboration with planning, engineering, and contractor teams, optimization of project budget and schedule

office
office

07

Project: Building with a total area of ​​more than 40,000m2, Neuköln, Berlin

Location: Berlin, Germany

Execution Period: 2023

Scope: Heating, Ventilation, Air Conditioning, Technical Equipment

Services:

  • Management of the transformation of a former shopping and parking facility into a multifunctional complex

  • Comprehensive renovation includes setting up supermarket areas, fast food outlets, retail stores, event spaces, office areas, and a rooftop restaurant with a pool

  • Tasks include planning and implementation of water and wastewater management, heating, ventilation, air conditioning, and fire protection systems