REFERENCES
01
​Project: Renovation of Wastewater Pipes
Location: 12043, Berlin
Timeframe: Winter 2024/25
Area: Sanitation
​
Services:
JeviTech Engineering carried out comprehensive plumbing installations in a multi-story building, with each floor covering 5,000 square meters. The ground floor, designed as a food court with bar and staff areas, and the first floor, which includes offices, showers, restrooms, and staff kitchens, were equipped with modern wastewater systems, prefabricated and wall-mounted elements, as well as accessible sanitary fixtures. The work was completed on schedule and with precision, while we continue to adapt the installations to meet the needs of the tenants.
02
Project: Heating and Water Installations
Location: 21502, Geesthacht
Timeframe: Winter 2024
Area: Heating Supply, Wastewater and Water Systems
Services:
As part of the modernization, the outdated water and heat meters were replaced with advanced, accurate devices and seamlessly integrated into a central management and control system. In the nine buildings, the old meters were carefully dismantled and properly disposed of. The new meters, along with the required accessories, were delivered, installed, and successfully commissioned, ensuring reliable and efficient monitoring of energy and water consumption.
03
Project: Modernization of the Ventilation Systems at Arendsee Castle
Location: 17291, Nordwestuckermark
Timeframe: Summer 2024
Area: Ventilation of the Sports Hall, SPA, and Castle
Services:
As part of this project, ventilation systems for the sports hall and SPA area were installed with special consideration for the historical building structure. After installation, the systems were commissioned and precisely fine-tuned to ensure smooth operation and effectively reduce energy losses.
04
Project: Optimization of Ventilation and Air Conditioning Systems to Improve Comfort and Energy Efficiency
Location: 10405, Berlin
Timeframe: Fall 2023
Area: Ventilation and Cooling
Services:
As part of the project, pressure losses in the ventilation ducts were calculated, and detailed floor plans and schematics for the ventilation and cooling systems were created. Existing systems were optimized, and new ventilation units were planned to reduce energy consumption and enhance comfort. The implementation took place in several phases, including the approval of design and execution plans.
05
​Project: New Construction of an Office and Residential Building
Location: 10785, Berlin
Timeframe: Winter 2023/24
Area: Heating and Cooling Technology
​
Services:
As part of our support for the client in selecting convectors from our partner MINIB, we took atypical, custom dimensions into account. These convectors offer increased performance and reduced noise levels, contributing to a pleasant indoor climate.
06
Project: Energy Renovation of 54 Apartments, Including Attic Conversion
Location: 10245, Berlin
Timeframe: Summer/Fall 2024
Area: Ventilation Technology
Services:
As part of the energy renovation of 54 apartments, including the conversion of the attic, modern ventilation systems were installed to enhance air quality and living comfort. By using demand-controlled ventilation and heat recovery systems, energy efficiency was significantly improved, reducing overall energy consumption. The new systems were seamlessly integrated into the existing building structure to ensure a smooth and efficient upgrade.
Kontaktieren Sie uns
Unser Team steht Ihnen jederzeit zur Verfügung, um Ihnen bei allen Fragen zu unseren Leistungen zu helfen. Sie können uns gerne eine Nachricht über unser Kontaktformular schicken. Wir freuen uns darauf, von Ihnen zu hören.
Alte Werftstraße 8, 15712, Königs Wusterhausen
+49 3375 2823989